Colombia
Between Manizales and the El Palo junction (turn-off to Rio Sucio) the route 29 is under construction (extensive road works).
Why? By checking in after you’ve visited a place you let others know this place is still functional. You can also add or correct any information.
Up to La Felisa all road work seems to be finished. From La Felisa to Medellin still road works
Report Check-InPassed here between 10am and 12am.Was not blocked, but long delays due to road construction.
Report Check-InPassed here between 10am and 12am and wasn’t blocked. Just the normal construction procedure
Report Check-InRoad ist still under construction. They gave us a information sheet about the blocking hours between La Manuela and Tres Puertas.
Monday-Friday: 10 am-12 noon and 2 pm-6 pm
Saturday: 9 am - 1 pm
Sunday and Holidays: no road block
Road is NOT closed, just under construction. Looks like this will be the new main highway as the work is top class. Just add an extra couple of hours onto your travel plans. This will likely control for another year.
Report Check-InRoad is open but still a lot of constructions going on. Sometimes you wait 30 min at one place.
Report Check-InThe road is still under construction. On Saturday morning, it took us 2 hours from La Pinada to this point.
Report Check-InHorrible! We were driving at night from Valley de Cocora to Medellin on purpose to avoid the traffic. Between Manizales and Medellin the whole road is under construction. It can take hours and hours to get between these two cities. I would suggest taking a different road instead. When we were driving from Medellin to Manizales, we made a turn in La Pintada and drove throw Aguadas and Pacaro. It´s a mountain road, but totally OK for regular cars.
Report Check-InRoad is open but needs time! Took us 2 hours from Peaje to Peaje (53km).
Report Check-Ingoogle took us this way heading south and it wasn’t that bad but i think at the wrong time it could be terrible. going north there were long lines of cars. seems like they still have work until the end of 2018.
Report Check-InIt‘s open now. Lot of constructions. Took us 4 hours from Medellin to this point.
Report Check-InStill closed.
You need to detour between Tres Puertas and La Felisa at the minimum. This 45 km section took us about 3hrs to detour through (going north) Arauca, Anserma, Riosucio and then down to La Felisa. If you are going for time and north bound turn off the panamericana South of Pereira and head north on the 25 through La Virginia and Asia then to Anserma. There is also an option to the east but they are working on their roads in this area too. Beautiful Coffee Country though
Between Manizales and the El Palo junction (turn-off to Rio Sucio) on the route 29 there are extensive road works that will be in place until at least mid-2018, probably longer. Many contra-flows each with a long delay. Many big trucks & buses. Recommend taking the route 25 instead if you can. The works may go further north than this we turned off the to Rio Sucio & Jardin.
Report Check-In